View Single Post
  #18  
Old 10-17-2017, 08:25 AM
ezzzzzzz ezzzzzzz is offline
Frequent Poster
 
Join Date: Apr 2010
Location: SE Va
Posts: 527
The limit is more likely the wire gauge than the fuse. The system will only pull what amps it needs. All of these circuits are fused further down the line. If you upgrade to a 150amp fuse upgrade the wire too. Use a chart to determine gauge needed as it can be smaller in short runs. Also consider the extended run time and amperage draw of a winch in use.
Reply With Quote